Post-Construction Floor Cleaning in Houston
Maddox cleans new and remodeled floors before turnover for builders, remodelers, fire and water rebuild contractors, and general contractors across Greater Houston. Drywall dust in textured LVP and tile, grout haze, adhesive and paint spots, and grit on bare slabs are removed with chemistry and brushes matched to the floor, and the floor is dry and ready for the final walkthrough the same day.
Post-Construction Floor Cleaning summary
- Service
- Final floor clean, one visit for most houses
- Floors
- Textured and smooth LVP and vinyl; ceramic, porcelain, and quarry tile with grout; bare, sealed, densified, and polished concrete; newly coated epoxy; VCT
- Removes
- Drywall dust, grout haze, adhesive and paint spots, slab grit
- Not offered
- Machine scrubbing of hardwood; heavy mortar and cured adhesive fields
- Timing
- After the last trade, before the walkthrough or racking; one to two days for most shells
- Debris haul-off
- Add-on to the final clean, quoted per trailer load plus disposal at cost
- Pricing
- Quoted from photos, $500 minimum
Construction dust settles into every texture on a finished floor: the embossed grain of luxury vinyl plank, the grout lines of tile, and the pores of a bare slab. After the final sweep a haze remains that shows in raking light. Maddox matches the cleaner, the brush, and the amount of water to each floor so every floor in the house or the building is turned over clean in one visit. Debris left behind by the trades can be hauled off on the same visit as an add-on, so the jobsite is turnover-ready when Maddox leaves.
Before and after
Drywall dust and joint compound had settled into the grain of about 1,600 sq ft of textured plank on a fire rebuild, and sweeping, mopping, and pads had not moved it. It came out in one visit.
What is included
Walkthrough or photo review
The floor types, the trades still coming, drain and water access, and the definition of clean on the punch list are confirmed before scheduling.
Dry pickup
Screws, wire, banding, dust piles, and loose dust are removed dry before any water is applied.
Textured LVP and vinyl
Dust is lifted out of the grain and removed from the floor with products and tools safe for the wear layer.
Tile and grout haze
Grout haze and mortar film are treated with chemistry rated for the tile and rinsed clean.
Slabs and polished concrete
Bare concrete is scrubbed for grit and residue with extra attention at doors and drywall lines; polished and sealed slabs are cleaned with products safe for the finish, after full cure.
Debris haul-off (add-on)
Scrap, packaging, offcuts, and pallets left by the trades are loaded, hauled, and disposed of at a licensed facility on the same visit. Hazardous, asbestos-suspect, and roofing tear-off material is excluded.
Closeout
Dated before-and-after photos of every room or bay are delivered the same day with the invoice, and a maintenance quote for after move-in is provided on request.
Typical facilities
- Remodels and whole-house renovations before the owner walkthrough
- Fire and water rebuilds after the last trade
- New custom homes and spec homes before closing
- Tenant build-outs for office, showroom, and retail space
- Tilt-wall distribution shells before lease-up or racking
- Re-scrubs after racking or fixture installation
How the work is performed
- The quote is a single figure, and any change in scope is agreed before work begins.
- The work is performed by Maddox personnel with Maddox equipment; nothing is subcontracted.
- The owner’s direct number is on every invoice, and any service issue goes to the owner directly.
- Contractors & Property Managers Final floor cleans, driveway make-rights after dumpsters and trucks, turnover scrubs, and portfolio programs, with photos for every closeout.
- Distribution Centers & 3PLs Forklift lanes, dock aprons, and racked aisles scrubbed on a schedule that fits your shipping windows.
Frequently asked questions
Can drywall dust be removed from textured LVP?
When in the schedule should the floors be cleaned?
Do you clean hardwood floors?
Can mortar haze, paint overspray, or adhesive be removed?
Do you prepare floors for epoxy or polished-concrete coatings?
How quickly can you mobilize?
Do you perform the full post-construction clean or only the floors?
What does the debris haul-off include?
- Driveway & Jobsite Stain Removal Rust rings, hydraulic fluid, oil, and equipment marks removed from driveways, pavers, and slabs after dumpsters, trucks, and construction.
- Warehouse Floor Cleaning Machine scrubbing of distribution and industrial floors to remove concrete dust, forklift grime, and tire marks.
- Recurring Floor Maintenance Scheduled scrubbing on a weekly, biweekly, monthly, or quarterly cadence at a fixed per-visit price.
- Construction Dust in Textured LVP: How to Get It Out Why drywall dust locks into the grain of textured luxury vinyl plank, why mopping leaves a haze, and what gets it out without damaging the wear layer.
- Post-Construction Concrete Floor Cleaning: A Checklist When to scrub a new slab, what a scrubber removes vs. what needs a grinder, the right sequence, and the mistakes that leave a new floor hazy at turnover.
- How Much Does Warehouse Floor Cleaning Cost in Houston? What drives the price of warehouse floor scrubbing in Houston, why per-square-foot rates fall as floors get bigger, and how to get a quote you can trust.
Request a post-construction floor cleaning quote
Send photos of the floors, the square footage, the turnover date, and a photo of any debris that needs to go. Most jobs are quoted from photos within one business day.